Bilibili 视频下载器

下载无水印或徽标的 Bilibili 视频的最简单方法

【无际计划】宰人航天?【航天】

提示! 右键单击并选择“Save link as...”进行下载。

VIDEOS
MP4 N/A 480P 下载
MP4 N/A 360P 下载
AUDIO
MP4 N/A mp4a.40.2 下载
MP4 N/A mp4a.40.5 下载
MP4 N/A mp4a.40.2 下载
THUMBNAILS
【无际计划】宰人航天?【航天】 JPEG Origin Image 下载
日志:

1956.3.16 Have Tannermeise.2 mounted on Carrier plane;
1956.3.21 Hans finished training of „experiential cockpit“;
1956.3.21 Tannermeise.2’s First flight;Reached Height of 70km;
1956.4.6 Finished Refurbishing Tannermeise.2;
1956.4.7 Hired engineers to 85
1956.4.23 Tannermeise mounted on Carrier plane;
1956.4.24 Hans finished training of this mission „experimental cockpit“.
1956.4.24 Tannermeise.2’s Second flight;Reached Height of 57 km, Successfully write down Flying conditions at 50 km.
1956.5.4 Hired engineers to 90
1956.5.16 Finished Refurbishment of Tannermeise.2;
1956.5.26 Hans finished training of this mission „experimental cockpuit“
1956.5.27 Have Tannermeise.2 mounted on carrier plane;
1956.5.27 Tannermeise.2’s Third flight;Reached Height of 65 km, Successfully write down Flying conditions at 55 km.
1956.6.4 Hired engineers to 100
1956.7.3 Finished constructing Buchfink.1 missile
1956.7.12 Buchfink.1 rolled out on pad;
1956.7.12 Buchfink.1 launched and reached 6253km downrange;Reentered at Iyengra.
1956.7.17 Finished construction of Buzzard complex;
1956.7.20 Finished Researching Early Avionics;
1956.7.22 Start building Bussard.1 Rocket;
1956.9.7 Hans Finished Training of „experimental cockpit“ and get flight plan;
1956.9.8 Tannermeise,2 mounted on carrier plane;
1956.9.8 Tannermeise.2’s fourth flight;Reached Height of 73km, Successfully written down flight condidions at 70 km;
1956.9.13 Хрущёв(赫鲁晓夫)is discontent about Grenzenlos program’s slow speed.
1956.9.26 Glushko Returns, bringing 137000 funds with him.(But we have to Pay back 94096 funds to buy Glushko’s RD-107/8)
1956.9.27 Hired engineers to 150;
1956.10.26 Researched Sateilite era Science;
1956.10.28 Hired engineers to 170;
1956.12.21 Researched Mature Supersonic flight;Bought Al-7 Turbojet;
1956.12.26 Tannenmeise.3’s First test flight, Reached Mach 2;Crashed beside runway,due to decreased manuverabilty.
1956.12.31 Hired engineers to 180